LOWER MAINLAND · PORT COQUITLAM

HiBAR projects in Port Coquitlam

Contact Performance Spray Insulation (PSI) about your Port Coquitlam project. Bring the building details and available assembly records so the proposed work and availability can be reviewed.

SOPREMA HiBAR material across exposed roof decking and steel joists
For a Port Coquitlam enquiry, use this HiBAR manufacturer reference to identify the material being discussed; send photographs of your own building for assessment.Source: SOPREMA HiBAR product gallery. Manufacturer reference, not a claimed Port Coquitlam project or PSI installation.

YOUR LOWER MAINLAND CONTACT

Talk to PSI about Port Coquitlam.

Performance Spray Insulation is the assigned enquiry contact for this area. Discuss the proposed work, product requirements, travel and availability directly.

Start with the assembly and access.

For your Port Coquitlam building, identify the roof deck, framing or other element involved and whether the existing coating has documented product identification. Include the purpose of the enquiry: new work, a renovation, damage after other trades or a review before finishes conceal the area.

Send marked-up drawings, accessible photos and any previous inspection or application records. Describe occupancy, access equipment routes, overhead services and the sequence of other trades. PSI can then identify the information needed to discuss the next step.

Keep the scope specific.

Ask the written proposal to name the product, treated area, preparation, documentation, exclusions and responsibilities. Refer design, assembly performance and inspection questions to the responsible project professionals using current manufacturer documents.

Local preparation for Port Coquitlam

Port Coquitlam lists separate permit resources for tenant improvements, single- and two-family buildings, and industrial, commercial or multi-unit projects. It also identifies changes of occupancy and interior renovation among work addressed by its permit process. Select the route that matches the whole project before isolating the insulation component.

Confirm these details

  • Is this a tenant improvement, residential renovation or larger multi-unit project?
  • Does the proposed use of the Port Coquitlam space differ from its current use?
  • Will the treated surface stay exposed, and who coordinates nearby services and finishes?

Official local guidance: Building Permits. Checked September 28, 2026. Confirm the route for your exact scope with the municipality.

Questions before your enquiry

Who do I contact about a HiBAR project in Port Coquitlam?

Performance Spray Insulation (PSI) is the assigned Lower Mainland enquiry contact. Call or text 778-779-4353, or email insulatevancouver@gmail.com. Confirm the specific work and availability directly.

Does PSI have a separate office in Port Coquitlam?

This page identifies an enquiry area, not a separate local office. Arrange travel, site access and an assessment with PSI.

What should I send with my Port Coquitlam project enquiry?

Send the building address, use, scope, accessible photographs, available drawings and material records. Describe whether this is new work, damage review or an existing coating assessment.

Can a photograph establish a HiBAR fire rating in Port Coquitlam?

No. The named product, assembly, installation records and responsible project professionals determine what evidence is required. Do not infer a rating from colour or appearance.

Who confirms permits for my Port Coquitlam project?

Ask the relevant local authority and project professionals about the complete scope. The municipal source below is a starting point; a product quotation alone does not establish permit requirements.

Nearby project guides

Coquitlam · Port Moody · Anmore

All 27 Lower Mainland locations →

Sources and page record

SOPREMA HiBAR information; official municipal guidance linked above. PSI enquiry assignment supplied by the site owner. No manufacturer approval, local office or performance rating is implied.

Last updated: September 29, 2026. Change log: added local project guidance and the assigned PSI contact.