REFERENCE GALLERY
See the material.
Keep the source.
A clear image can explain an application. Traceable records establish the actual product, contractor and project.

Have a project to document?
Send original overview and detail photographs, the product records, location and contractor credit you are authorised to publish. Retain the originals alongside any public copies.
Project submissions are reviewed before publication. We do not label an unverified image as a HiBAR installation.
↗
Document a project
Match photographs to written records and supported captions.
↗Share project information
Prepare a project enquiry or send a source correction.
MAKE THE NEXT CONVERSATION USEFUL
Start with the building.
Then define the work.
Share your location, drawings, existing conditions and what you want to achieve.