THE MATERIAL

HiBAR: product first.
Assembly next.

SOPREMA describes HiBAR as a semi-cementitious spray-applied blend of high-temperature mineral fibres and proprietary binders.

SOPREMA-identified HiBAR coating covering an exposed roof deck and open-web joists
Manufacturer-identified HiBAR over a roof deck and open-web joists. The material follows the exposed surfaces rather than forming a flat ceiling tile grid. Photo: SOPREMA, HiBAR product gallery. Installer, location and installed thickness are not identified.

Three questions to keep together

Which product? Retain the product identification and current supporting documents.

Which assembly? Identify the building element, substrate and design requirements.

Which project conditions? Review access, preparation, sequencing and verification for the actual site.

Go to the primary source

SOPREMA’s product page provides the current technical and safety document links. Confirm design and installation requirements with the manufacturer and responsible project professionals.

SOPREMA HiBAR information ↗

MAKE THE NEXT CONVERSATION USEFUL

Start with the building.
Then define the work.

Share your location, drawings, existing conditions and what you want to achieve.

Prepare your enquiry ↗