HIBAR FIRE-SPRAY INSULATION SERVICES
Plan new fire-spray insulation
Prepare a clear scope for HiBAR installation in a new building, addition or newly exposed work area.
Start with the design requirements
Identify the building elements and the thermal, acoustic or fire-resistance objectives in the project documents. HiBAR is a spray-applied mineral-fibre product; the specified assembly and current manufacturer requirements determine how it is used. Provide the relevant drawing revisions and specification sections with the enquiry.
Coordinate access and construction sequence
Describe deck and framing conditions, working heights, lift access and the surrounding services. Ask the project team to agree when substrate review, application, inspection and follow-on trades will occur. Include the work-zone boundaries and any occupancy or scheduling constraints in the quotation brief.
Compare complete installation proposals
Ask each proposal to identify the material, included areas, surface preparation, access equipment, adjacent-area protection, documentation and exclusions. Identify who supplies design information and who reviews the completed work. Retain accepted submittals and location records for future maintenance.
Questions about this service
Is this only for new construction?
A new installation enquiry may concern a new building, an addition or an area newly included in a renovation scope. Describe the existing conditions so the correct work can be assessed.
What documents should I provide?
Provide current drawings, the specification, assembly references, intended performance objectives and available access information.
Can one thickness be used for every project?
Application requirements depend on the specified product and assembly. Confirm them through the responsible project professionals and current manufacturer documents.
Can I ask about thermal and acoustic work?
Yes. State whether the project objective is thermal insulation, acoustic control, fire resistance or a combination so the enquiry can be reviewed against the design.
How do I discuss a Lower Mainland installation?
Open your city page for the assigned PSI call, text and email details, then confirm the proposed scope, timing and availability directly.
Discuss your project with PSI
Performance Spray Insulation is the assigned contact for the 27 Lower Mainland city pages. Choose your location for call, text and email details and confirm the scope and availability directly.
Read all 16 HiBAR articles · Explore building applications
Sources and page record
SOPREMA HiBAR product information. Product and assembly requirements should be confirmed with the responsible project professionals. Published by Industry Army Marketing. Updated September 29, 2026.