APPLICATIONS
What is the work meant to achieve?
Choose the design objective first. Then connect the material, assembly and project conditions.

Fire-resistance planning
Connect the product to the specified building assembly and inspection requirements.
↗Thermal insulation
Identify the thermal objective, building element and applicable design information.
↗Acoustic control
Clarify the sound-control objective and the complete construction around it.
↗Commercial overhead work
Coordinate coated elements, services, access and follow-on trades.
MAKE THE NEXT CONVERSATION USEFUL
Start with the building.
Then define the work.
Share your location, drawings, existing conditions and what you want to achieve.
HIBAR FIRE-SPRAY INSULATION SERVICES
Repairs. New installations. Complete redos.
Choose the work you need, then find your Lower Mainland city contact.
HiBAR repairs
Assess damaged, missing or disturbed HiBAR and define the repair area before requesting a quotation.
↗New HiBAR installation
Prepare a clear scope for HiBAR installation in a new building, addition or newly exposed work area.
↗Complete HiBAR replacement
Define the full scope for removing an existing coating and replacing it with a specified spray-applied system.