LOWER MAINLAND · ANMORE
HiBAR projects in Anmore
Contact Performance Spray Insulation (PSI) about your Anmore project. Bring the building details and available assembly records so the proposed work and availability can be reviewed.

YOUR LOWER MAINLAND CONTACT
Talk to PSI about Anmore.
Performance Spray Insulation is the assigned enquiry contact for this area. Discuss the proposed work, product requirements, travel and availability directly.
Start with the assembly and access.
For your Anmore building, identify the roof deck, framing or other element involved and whether the existing coating has documented product identification. Include the purpose of the enquiry: new work, a renovation, damage after other trades or a review before finishes conceal the area.
Send marked-up drawings, accessible photos and any previous inspection or application records. Describe occupancy, access equipment routes, overhead services and the sequence of other trades. PSI can then identify the information needed to discuss the next step.
Keep the scope specific.
Ask the written proposal to name the product, treated area, preparation, documentation, exclusions and responsibilities. Refer design, assembly performance and inspection questions to the responsible project professionals using current manufacturer documents.
Local preparation for Anmore
Anmore’s building guidance makes the property owner responsible for completing the required permits and forms, and asks that trades working on the project have a valid Village business licence. Before finalizing insulation work, confirm who is managing those checks and which renovation documents describe the treatment area.
Confirm these details
- Who is coordinating Anmore’s permit and trade-licence checks for the project?
- Are suitable site facilities and an equipment access route available?
- Which inspection needs to be arranged before the next stage of work?
Official local guidance: Building & Renovating. Checked September 28, 2026. Confirm the route for your exact scope with the municipality.
Questions before your enquiry
Who do I contact about a HiBAR project in Anmore?
Performance Spray Insulation (PSI) is the assigned Lower Mainland enquiry contact. Call or text 778-779-4353, or email insulatevancouver@gmail.com. Confirm the specific work and availability directly.
Does PSI have a separate office in Anmore?
This page identifies an enquiry area, not a separate local office. Arrange travel, site access and an assessment with PSI.
What should I send with my Anmore project enquiry?
Send the building address, use, scope, accessible photographs, available drawings and material records. Describe whether this is new work, damage review or an existing coating assessment.
Can a photograph establish a HiBAR fire rating in Anmore?
No. The named product, assembly, installation records and responsible project professionals determine what evidence is required. Do not infer a rating from colour or appearance.
Who confirms permits for my Anmore project?
Ask the relevant local authority and project professionals about the complete scope. The municipal source below is a starting point; a product quotation alone does not establish permit requirements.
Nearby project guides
Coquitlam · Port Coquitlam · Port Moody
All 27 Lower Mainland locations →
Sources and page record
SOPREMA HiBAR information; official municipal guidance linked above. PSI enquiry assignment supplied by the site owner. No manufacturer approval, local office or performance rating is implied.
Last updated: September 29, 2026. Change log: added local project guidance and the assigned PSI contact.