LOWER MAINLAND · COQUITLAM
HiBAR projects in Coquitlam
Contact Performance Spray Insulation (PSI) about your Coquitlam project. Bring the building details and available assembly records so the proposed work and availability can be reviewed.

YOUR LOWER MAINLAND CONTACT
Talk to PSI about Coquitlam.
Performance Spray Insulation is the assigned enquiry contact for this area. Discuss the proposed work, product requirements, travel and availability directly.
Start with the assembly and access.
For your Coquitlam building, identify the roof deck, framing or other element involved and whether the existing coating has documented product identification. Include the purpose of the enquiry: new work, a renovation, damage after other trades or a review before finishes conceal the area.
Send marked-up drawings, accessible photos and any previous inspection or application records. Describe occupancy, access equipment routes, overhead services and the sequence of other trades. PSI can then identify the information needed to discuss the next step.
Keep the scope specific.
Ask the written proposal to name the product, treated area, preparation, documentation, exclusions and responsibilities. Refer design, assembly performance and inspection questions to the responsible project professionals using current manufacturer documents.
Local preparation for Coquitlam
Coquitlam’s homeowner guidance connects building projects with property zoning and the rules that apply to the site. Before requesting an insulation price for a conversion or addition, clarify the intended use of the finished space. A garage retained for parking and a space proposed for living accommodation should not share an undefined scope.
Confirm these details
- Will the Coquitlam space keep its existing use or be converted?
- Which approved assembly and surface area should the insulation quotation cover?
- Who is responsible for opening and reinstating existing finishes?
Official local guidance: Building Projects — Homeowner/Residential. Checked September 28, 2026. Confirm the route for your exact scope with the municipality.
Questions before your enquiry
Who do I contact about a HiBAR project in Coquitlam?
Performance Spray Insulation (PSI) is the assigned Lower Mainland enquiry contact. Call or text 778-779-4353, or email insulatevancouver@gmail.com. Confirm the specific work and availability directly.
Does PSI have a separate office in Coquitlam?
This page identifies an enquiry area, not a separate local office. Arrange travel, site access and an assessment with PSI.
What should I send with my Coquitlam project enquiry?
Send the building address, use, scope, accessible photographs, available drawings and material records. Describe whether this is new work, damage review or an existing coating assessment.
Can a photograph establish a HiBAR fire rating in Coquitlam?
No. The named product, assembly, installation records and responsible project professionals determine what evidence is required. Do not infer a rating from colour or appearance.
Who confirms permits for my Coquitlam project?
Ask the relevant local authority and project professionals about the complete scope. The municipal source below is a starting point; a product quotation alone does not establish permit requirements.
Nearby project guides
Port Coquitlam · Port Moody · Anmore
All 27 Lower Mainland locations →
Sources and page record
SOPREMA HiBAR information; official municipal guidance linked above. PSI enquiry assignment supplied by the site owner. No manufacturer approval, local office or performance rating is implied.
Last updated: September 29, 2026. Change log: added local project guidance and the assigned PSI contact.