LOWER MAINLAND · MISSION
HiBAR projects in Mission
Contact Performance Spray Insulation (PSI) about your Mission project. Bring the building details and available assembly records so the proposed work and availability can be reviewed.

YOUR LOWER MAINLAND CONTACT
Talk to PSI about Mission.
Performance Spray Insulation is the assigned enquiry contact for this area. Discuss the proposed work, product requirements, travel and availability directly.
Start with the assembly and access.
For your Mission building, identify the roof deck, framing or other element involved and whether the existing coating has documented product identification. Include the purpose of the enquiry: new work, a renovation, damage after other trades or a review before finishes conceal the area.
Send marked-up drawings, accessible photos and any previous inspection or application records. Describe occupancy, access equipment routes, overhead services and the sequence of other trades. PSI can then identify the information needed to discuss the next step.
Keep the scope specific.
Ask the written proposal to name the product, treated area, preparation, documentation, exclusions and responsibilities. Refer design, assembly performance and inspection questions to the responsible project professionals using current manufacturer documents.
Local preparation for Mission
Mission publishes distinct checklists for renovations, additions, secondary suites, accessory buildings and manufactured homes. Select the one that fits the structure being assessed. If insulation work accompanies a conversion or basement project, describe the complete change instead of treating the surface treatment as an isolated job.
Confirm these details
- Which Mission checklist fits this structure and proposed alteration?
- Can the installer reach every surface through the available crawlspace or room access?
- Who will confirm the assembly details and readiness of the work area?
Official local guidance: Building Permit Checklists. Checked September 28, 2026. Confirm the route for your exact scope with the municipality.
Questions before your enquiry
Who do I contact about a HiBAR project in Mission?
Performance Spray Insulation (PSI) is the assigned Lower Mainland enquiry contact. Call or text 778-779-4353, or email insulatevancouver@gmail.com. Confirm the specific work and availability directly.
Does PSI have a separate office in Mission?
This page identifies an enquiry area, not a separate local office. Arrange travel, site access and an assessment with PSI.
What should I send with my Mission project enquiry?
Send the building address, use, scope, accessible photographs, available drawings and material records. Describe whether this is new work, damage review or an existing coating assessment.
Can a photograph establish a HiBAR fire rating in Mission?
No. The named product, assembly, installation records and responsible project professionals determine what evidence is required. Do not infer a rating from colour or appearance.
Who confirms permits for my Mission project?
Ask the relevant local authority and project professionals about the complete scope. The municipal source below is a starting point; a product quotation alone does not establish permit requirements.
Nearby project guides
Maple Ridge · Pitt Meadows · Abbotsford
All 27 Lower Mainland locations →
Sources and page record
SOPREMA HiBAR information; official municipal guidance linked above. PSI enquiry assignment supplied by the site owner. No manufacturer approval, local office or performance rating is implied.
Last updated: September 29, 2026. Change log: added local project guidance and the assigned PSI contact.