LOWER MAINLAND · DELTA

HiBAR projects in Delta

Contact Performance Spray Insulation (PSI) about your Delta project. Bring the building details and available assembly records so the proposed work and availability can be reviewed.

SOPREMA HiBAR material across exposed roof decking and steel joists
For a Delta enquiry, use this HiBAR manufacturer reference to identify the material being discussed; send photographs of your own building for assessment.Source: SOPREMA HiBAR product gallery. Manufacturer reference, not a claimed Delta project or PSI installation.

YOUR LOWER MAINLAND CONTACT

Talk to PSI about Delta.

Performance Spray Insulation is the assigned enquiry contact for this area. Discuss the proposed work, product requirements, travel and availability directly.

Start with the assembly and access.

For your Delta building, identify the roof deck, framing or other element involved and whether the existing coating has documented product identification. Include the purpose of the enquiry: new work, a renovation, damage after other trades or a review before finishes conceal the area.

Send marked-up drawings, accessible photos and any previous inspection or application records. Describe occupancy, access equipment routes, overhead services and the sequence of other trades. PSI can then identify the information needed to discuss the next step.

Keep the scope specific.

Ask the written proposal to name the product, treated area, preparation, documentation, exclusions and responsibilities. Refer design, assembly performance and inspection questions to the responsible project professionals using current manufacturer documents.

Local preparation for Delta

Delta’s building guidance directs owners to different submission requirements for residential, non-residential and secondary-suite projects. When insulation is included in a basement finish, suite alteration or commercial renovation, describe that wider project to the Application Centre. Confirm the requirements for the actual scope instead of treating every insulation job as the same kind of repair.

Confirm these details

  • Is the work part of a dwelling renovation, secondary suite or non-residential project?
  • Has Delta’s Application Centre confirmed the submission requirements for this scope?
  • Which inspection must take place before the treated area is enclosed?

Official local guidance: Building & Renovating. Checked September 28, 2026. Confirm the route for your exact scope with the municipality.

Questions before your enquiry

Who do I contact about a HiBAR project in Delta?

Performance Spray Insulation (PSI) is the assigned Lower Mainland enquiry contact. Call or text 778-779-4353, or email insulatevancouver@gmail.com. Confirm the specific work and availability directly.

Does PSI have a separate office in Delta?

This page identifies an enquiry area, not a separate local office. Arrange travel, site access and an assessment with PSI.

What should I send with my Delta project enquiry?

Send the building address, use, scope, accessible photographs, available drawings and material records. Describe whether this is new work, damage review or an existing coating assessment.

Can a photograph establish a HiBAR fire rating in Delta?

No. The named product, assembly, installation records and responsible project professionals determine what evidence is required. Do not infer a rating from colour or appearance.

Who confirms permits for my Delta project?

Ask the relevant local authority and project professionals about the complete scope. The municipal source below is a starting point; a product quotation alone does not establish permit requirements.

Nearby project guides

Surrey · White Rock · Langley City

All 27 Lower Mainland locations →

Sources and page record

SOPREMA HiBAR information; official municipal guidance linked above. PSI enquiry assignment supplied by the site owner. No manufacturer approval, local office or performance rating is implied.

Last updated: September 29, 2026. Change log: added local project guidance and the assigned PSI contact.