LOWER MAINLAND · CHILLIWACK
HiBAR projects in Chilliwack
Contact Performance Spray Insulation (PSI) about your Chilliwack project. Bring the building details and available assembly records so the proposed work and availability can be reviewed.

YOUR LOWER MAINLAND CONTACT
Talk to PSI about Chilliwack.
Performance Spray Insulation is the assigned enquiry contact for this area. Discuss the proposed work, product requirements, travel and availability directly.
Start with the assembly and access.
For your Chilliwack building, identify the roof deck, framing or other element involved and whether the existing coating has documented product identification. Include the purpose of the enquiry: new work, a renovation, damage after other trades or a review before finishes conceal the area.
Send marked-up drawings, accessible photos and any previous inspection or application records. Describe occupancy, access equipment routes, overhead services and the sequence of other trades. PSI can then identify the information needed to discuss the next step.
Keep the scope specific.
Ask the written proposal to name the product, treated area, preparation, documentation, exclusions and responsibilities. Refer design, assembly performance and inspection questions to the responsible project professionals using current manufacturer documents.
Local preparation for Chilliwack
Chilliwack’s permit resources include residential pre-design and post-design checklists as well as an online application route for eligible projects. Use those stages to define the insulation scope before requesting a final price. Confirm the application method for your project rather than assuming that every type of renovation uses the same intake process.
Confirm these details
- Which Chilliwack checklist and submission method apply to the full project?
- Who holds the permit or folder number and will arrange inspections?
- Will access to the proposed ceiling or attic work remain available throughout the required stages?
Official local guidance: Building Permits. Checked September 28, 2026. Confirm the route for your exact scope with the municipality.
Questions before your enquiry
Who do I contact about a HiBAR project in Chilliwack?
Performance Spray Insulation (PSI) is the assigned Lower Mainland enquiry contact. Call or text 778-779-4353, or email insulatevancouver@gmail.com. Confirm the specific work and availability directly.
Does PSI have a separate office in Chilliwack?
This page identifies an enquiry area, not a separate local office. Arrange travel, site access and an assessment with PSI.
What should I send with my Chilliwack project enquiry?
Send the building address, use, scope, accessible photographs, available drawings and material records. Describe whether this is new work, damage review or an existing coating assessment.
Can a photograph establish a HiBAR fire rating in Chilliwack?
No. The named product, assembly, installation records and responsible project professionals determine what evidence is required. Do not infer a rating from colour or appearance.
Who confirms permits for my Chilliwack project?
Ask the relevant local authority and project professionals about the complete scope. The municipal source below is a starting point; a product quotation alone does not establish permit requirements.
Nearby project guides
Kent · Harrison Hot Springs · Hope
All 27 Lower Mainland locations →
Sources and page record
SOPREMA HiBAR information; official municipal guidance linked above. PSI enquiry assignment supplied by the site owner. No manufacturer approval, local office or performance rating is implied.
Last updated: September 29, 2026. Change log: added local project guidance and the assigned PSI contact.