APPLICATION GUIDE

Begin with the required building assembly.

HiBAR can form part of a fire-resistance design. A coating photograph or product name does not establish a rating for a particular building.

SOPREMA-identified HiBAR coating covering an exposed roof deck and open-web joists
The coated roof deck and joists show the material in place; a fire-resistance rating must come from the specified assembly and supporting project documents. Photo: SOPREMA, HiBAR product gallery. Installer, location and installed thickness are not identified.

Confirm the design basis

Ask the responsible designer for the specified assembly and applicable documentation. Identify the building element, substrate and required performance.

Plan verification

Agree inspection access, required records and the review of repairs or changes before work starts.

Read current SOPREMA HiBAR product information and documents ↗

↗

Continue planning

Read the related project guide.

↗

All applications

Compare the other planning categories.

MAKE THE NEXT CONVERSATION USEFUL

Start with the building.
Then define the work.

Share your location, drawings, existing conditions and what you want to achieve.

Prepare your enquiry ↗