APPLICATION GUIDE
Define the thermal objective and the building element.
HiBAR is used to add thermal resistance in building assemblies. The design must address the actual construction and conditions of the project.

Describe the construction
Include drawings, the substrate, the proposed location of insulation and any known limitations or existing conditions.
Request project-specific information
Confirm the proposed thickness and performance using current manufacturer information and the project designer. Do not substitute a generic value for a design.
Read current SOPREMA HiBAR product information and documents ↗
↗
Continue planning
Read the related project guide.
↗All applications
Compare the other planning categories.
MAKE THE NEXT CONVERSATION USEFUL
Start with the building.
Then define the work.
Share your location, drawings, existing conditions and what you want to achieve.