Occupation changes how a project is scheduled and handed over. Define the work zones and operational needs before the contractor proposes application arrangements.

HiBAR planning diagram: occupied space — record users and essential access; work zone — review separation and work sequence; reopening — agree who accepts the completed area.
Occupied space → Work zone → Reopening. This diagram explains the review sequence covered on this page. Illustration: Industry Army Marketing (IAM), based on this article’s planning checklist. Diagram only; not a project photograph or installation detail.

Record the building constraints

Identify public routes, tenants, deliveries and systems that must remain operational. State permitted work periods and any shutdown approval process. These are pricing inputs, not details to settle after mobilisation.

Review the work-zone plan

Ask for product-specific protection, separation, ventilation and cleanup arrangements. Have building operations review their effect on neighbouring spaces. The contractor should identify any conditions that prevent the planned phase from proceeding.

Agree reopening responsibility

Document who checks the completed area and authorises its return to use. Include outstanding items and any continuing restrictions in the handover. Keep a contingency for work that extends beyond the booked window.

Keep with your project brief